top of page
Search


What Must a DFW Builder Spec Before Framing Closes for a Glass Stair System?
A glass stair system can't be figured out after flooring — the blocking, steel, and railing anchorage points must be engineered before framing closes. IBC 2021 requires laminated glass panels meeting CPSC Category II, and that spec change alone shifts panel weight and the structure your framer has to build. Here's what DFW luxury builders must lock in early to keep the install on schedule.

Eridion
Aug 306 min read
Resource Library
bottom of page
